What's Happening

Our story architecting and buildling the first passive house in Utah.

Subscribe to RSS

Week Off Post 2

Posted: 07/12/2009

In addition to flower picking, this week, the second floor framing began and you can really start to see the shape of the home as well as the home’s relation to the neighbor’s home. In terms of design work we picked out cabinet colors and started the countertop discussion. We’ve also picked out the final layout and cabient design for the master bathroom. And the final cabinet design for the kitchen. We tried to match the size of our desired cabinets with those that are sold at Ikea and we were unsucessful at finding a couple.

Categories: Uncategorized | Comments: No Comments »

This entry was posted on Sunday, July 12th, 2009 at 7:33 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>