Posted: 08/16/2009

This week Rebecca and I have trudged further down the interior design path. Our architect warned us that the number of decisions to be made was daunting. But until you experience it first hand you really aren’t prepared.

We are currently working on trying to pick out the final plumbing fixtures for the upstairs, tile for both bathrooms, closet in the master, lighting fixtures, and of course the electrical plan. We have spent the weekend at IKEA and Bedrosian’s looking at lighting fixtures, tile, counter tops  and possible closet solutions. We did order our tub filler, downstairs bathroom faucet. Next week looks like more lighting fixtures, and maybe taking a crack at a counter top.

Categories: Uncategorized | Comments: 2 Comments »

Update

Posted: 08/2/2009

Just a quick note about what’s been going on.

1. The windows shipped, and we are looking forward to them arriving tomorrow Aug 3rd.

2. We’ve been trying to figure out what we will be doing for the patio. And weather or not the flooring from the patio makes it into the breezeway or if the breezeway will mimic the house.

3. We’ve gotten the list of toilets down to two manufacturers. Either Toto Coroma.

4. We’ve almost finalized the plumbing finishes. We’re still looking for a great tub filler.

For this up coming week we should be doing the electrical walk through.

Categories: Uncategorized | Comments: No Comments »