What's Happening

Our story architecting and buildling the first passive house in Utah.

Subscribe to RSS

Update

Posted: 08/2/2009

Just a quick note about what’s been going on.

1. The windows shipped, and we are looking forward to them arriving tomorrow Aug 3rd.

2. We’ve been trying to figure out what we will be doing for the patio. And weather or not the flooring from the patio makes it into the breezeway or if the breezeway will mimic the house.

3. We’ve gotten the list of toilets down to two manufacturers. Either Toto Coroma.

4. We’ve almost finalized the plumbing finishes. We’re still looking for a great tub filler.

For this up coming week we should be doing the electrical walk through.

Categories: Uncategorized | Comments: No Comments »

This entry was posted on Sunday, August 2nd, 2009 at 9:43 pm and is filed under Uncategorized. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

Leave a Reply

XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>